The SCA owned pellet production plant BioNorr AB built a new production line in direct connection to the existing line and the design capacity is 90 000 ton per year of wood pellets.
The new line is similar to the old and uses a hot gas mill for drying. VTS AB software supply is the calculat ions of the dryer system and the engineering of the burner chamber.
VTS hardware supply is the 10 MW burner, wood powder dosing and transport system, gas train and wood powder milling system.